Project Description

Project Details

Project Location: Lake Elsinore, CA
APPROX. PROJECT Cost: $3,240,000
ProjectED DURATION: 04 Months
Actual duration: 04 Months

Project Description

Constructing a superior dugout, both on time and within budget, ultimately lead to the hiring of Hamel Contracting. Hamel Contracting did just that, with the removal of existing turf and baseball field structures, improvement of storm drainage system, installation of new outfield scoreboard mounted on steel columns, and construction of a new baseball venue with 28 ft. high chain-link backstop, CMU block dugouts with storage space, and elevated viewing area with aluminum bleachers.