Project Details

  • Project Location: El Centro, CA
  • Owner/Client: City of El Centro
  • Approx. Project Cost: $13,000,000
  • Completion: October 2019
  • Duration: 16.5 Months

Project Description

The Plunge Swimming Pool was a deteriorating swim facility that the City of El Centro was forced to shut down. This allowed for a new 3.5 Acre Aquatic Center that includes an eight lane competition pool, a 2,039 square foot warm up pool, a 1,605 square foot kiddie pool, and a 5,335 square foot lazy river. The project also includes a 5,107 square foot building containing locker rooms, staff offices, a snack bar, storage, and an event center. There is also a 2,045 square foot utility building that houses all the MEP systems. The site has several shade structures and much needed additional parking.